Today it is all Grid 16 where they are uncovering more of their mudbrick wall every day. Approximately 6 meters of the mudbrick construction is uncovered and it shows every sign of continuing.

Digging brick mining pits in Grid 16 

Digging brick mining pits in Grid 16 

Picking down to mudbrick or bedrock, whichever comes first.

Picking down to mudbrick or bedrock, whichever comes first.

Dan, Kate and Josh discuss the pits cutting the mudbrick wall.

Dan, Kate and Josh discuss the pits cutting the mudbrick wall.

Finally, a great picture of Dan and Adam doing some heavy lifting.